[REFAT] Launch of landscaping work : 2 down, 8 more to go!

[REFAT] Launch of landscaping work : 2 down, 8 more to go!

8 March, 2021

Last Monday, March the 08th, the construction company SGTP “Société des Grands Travaux Publics”, responsible for landscaping the sites of the 10 photovoltaic water-pumping stations of REFAT project, under the supervision of MEDREC's technical expert, has just finished 2 out of 10 installation sites.

Both sites at “Nweji” and “Wled Jelliti” in the governorate of Sousse were fitted out before fixing the reinforcements in order to pour the needed concrete for the two stations.

8 other sites located in Kairouan, Sidi Bouzid, Gafsa and Kasserine governorates are still in process.


Related News
18 January, 2023
On the 17th of January 2023, the Mediterranean renewable Energy Centre (MEDREC), partner of SEACAP4SDG, the municipality of Bizerte and a Tunisian ext.
16 January, 2023
Profil demandé et modalité de participation dans le document de l'annonce téléchargeable ci-après.Pour postuler, veuillez envoyer le dossier de candid.
10 January, 2023
Dans le cadre du projet ICAPT (Implementing Climate-smart Agriculture Practices in Tunisia), le Centre Méditerranéen des Energies Renouvelables MEDREC.
14 December, 2022
The online platform created is the “agora” that allows the rapprochement and the dialogue between all the actors concerned by the university building.
9 December, 2022
Le projet EauSIRIS est co-financé par l’Union Européenne à travers le programme IEV de coopération transfrontalière Italie-Tunisie 2014-2020. Il a pou.
27 October, 2022
Dans le cadre du Projet EauSIRIS « Nouvelle stratégie de gestion des Eaux, des Sols et Implantation des Technologies vertes pour une Agricul.