[REFAT] Launch of landscaping work : 2 down, 8 more to go!

[REFAT] Launch of landscaping work : 2 down, 8 more to go!

8 March, 2021

Last Monday, March the 08th, the construction company SGTP “Société des Grands Travaux Publics”, responsible for landscaping the sites of the 10 photovoltaic water-pumping stations of REFAT project, under the supervision of MEDREC's technical expert, has just finished 2 out of 10 installation sites.

Both sites at “Nweji” and “Wled Jelliti” in the governorate of Sousse were fitted out before fixing the reinforcements in order to pour the needed concrete for the two stations.

8 other sites located in Kairouan, Sidi Bouzid, Gafsa and Kasserine governorates are still in process.


Related News
23 June, 2022
Le Centre Méditerranéen des Energies Renouvelables (MEDREC), partenaire du projet SEACAP 4SDG, a lancé un appel pour sélectionner un auditeur externe.
22 June, 2022
le Centre Méditerranéen des Energies Renouvelables (MEDREC), partenaire du projet SEACAP 4SDG, lance une consultation afin de sélectionner un(des) Exp.
22 June, 2022
The Mediterranean Renewable Energy Centre (MEDREC), partner of SEACAP 4SDG project,  is launching an a call for expertise to provide Tunisian mun.
21 June, 2022
The Mediterranean Renewable Energy Centre (MEDREC), partner of SEACAP 4SDG project,  is launching an Expression of interest dedicated to Tunisian.
21 June, 2022
Le Centre Méditerranéen des Énergies Renouvelables (MEDREC), partenaire du projet SEACAP 4SDG, lance un appel à manifestation d’intérêt pour l’assista.
15 June, 2022
On 18th May 2022, Naples Agency for Energy and the Environment (ANEA), Italian partner of Med-EcoSuRe project, participated in the 2ndsemina.