Installation of REFAT pilots is progressing

Installation of REFAT pilots is progressing

22 April, 2021

“Sunrise Concept” represented by its CEO Mr. Mohamed Ali ATIG, was invited to MEDREC on April 22, 2021, to sign the procurement contract for the needed mounting system for REFAT photovoltaic water pumping stations in Gafsa, SidiBouzid, Kasserine, Kairouan and Sousse.

MEDREC, the implementing agency of REFAT project, has launched  public  tenders to acquire the mounting system and the complementary electric equipments, to be installed in  REFAT pilot installations.


Related News
25 February, 2021
The Mediterranean Renewable Energy Centre (MEDREC), in collaboration with the National Agency for Energy Management (ANME), organized a work.
24 February, 2021
On February 24th, the manager of the company SGTP “Société des Grands Travaux Publics”, was invited to MEDREC in order to sign the contract to start t.
15 February, 2021
The coordinator of the Tunisian-Italian group "SATER SOLAR SA", awarded with the above-mentioned call for tender, was invited to MEDREC for the offici.
9 February, 2021
Med-EcoSuRe proposed a challenge, in the framework of the Challenge-based module of the ERASMUS MUNDUS Master DENSYS (Decentralised smart ENergy.
5 February, 2021
Tunisia: Med-EcoSuRe sets the stage for energy generation and trading in a Micro-Grid platformA Micro-Grid platform powered by PV solar panels, SMARTN.
5 January, 2021
The managing authority of the Italy-Tunisia cross-border cooperation program, of the European Neighborhood Instrument, announced that project EauSIRIS.