[REFAT] SONEDE launches the construction of a 512kW photovoltaic power plant at Chott El Fejij, Gabès

[REFAT] SONEDE launches the construction of a 512kW photovoltaic power plant at Chott El Fejij, Gabès

4 May, 2021

In the framework of REFAT project, the National Water Distribution Utility – SONEDE started the installation of a 512kW photovoltaic power plant, for pumping drinking water at Chott El Fejij, Gabès and which covers 8000 square meters. 

This project, aiming at promoting renewable energies and sustainable water management, is funded by the Tunisian Ministry of Agriculture, Hydraulic Resources and Fisheries and the Italian Ministry of Environment, Land and Sea under the patronage of the Italian Embassy in Tunisia and implemented by MEDREC.

REFAT launches the 512 kWc photovoltaic installation at Chott El Fejij, Gabes

SATER SOLAR SA, the head of the Tunisian-Italian consortium selected for the installation of 512 kWc Photovoltaic power plant in the framework of the call for tenders N°01/2019 of REFAT project, has officially launched, on April 1st, 2021, the landscaping process of the plant which will be implemented in SONEDE water pumping station located in Chott El Fejij, Gabes. 

The implementation of this power plant is a step towards reducing Energy consumption of water supply in small-scale irrigation and drinking water production in remote areas, which is expected to cover 20% of the energy consumption of the water pumping station.

 


Related News
22 March, 2021
Being aware of the importance of water resource and the challenges that we are facing, for their preservation, MEDREC has been working, since 2018, on.
17 March, 2021
En partenariat avec le Ministère de l’Agriculture, des Ressources Hydrauliques et de la Pêche, le Centre Méditerranéen des Énergies Renouvelables (MED.
15 March, 2021
An online training course has been successfully conducted, by the Department of Architecture of the University of Campania "L. Vanvitelli, in col.
8 March, 2021
Last Monday, March the 08th, the construction company SGTP “Société des Grands Travaux Publics”, responsible for landscaping the sites of the 10 photo.
5 March, 2021
In March the 05th, a five-year partnership agreement was signed between IRESA (Institution de la Recherche et de l'Enseignement Supérieur Agricoles) a.
25 February, 2021
 MEDREC, in collaboration with the National Agency for Energy Management ( ANME), conducted a workshop on February 25, 2021 in Tunis, Tunisia.The.