[REFAT] Launch of landscaping work : 2 down, 8 more to go!

[REFAT] Launch of landscaping work : 2 down, 8 more to go!

8 March, 2021

Last Monday, March the 08th, the construction company SGTP “Société des Grands Travaux Publics”, responsible for landscaping the sites of the 10 photovoltaic water-pumping stations of REFAT project, under the supervision of MEDREC's technical expert, has just finished 2 out of 10 installation sites.

Both sites at “Nweji” and “Wled Jelliti” in the governorate of Sousse were fitted out before fixing the reinforcements in order to pour the needed concrete for the two stations.

8 other sites located in Kairouan, Sidi Bouzid, Gafsa and Kasserine governorates are still in process.


Related News
1 July, 2021
 « Prolongation Des Délais De Soumission Des Offres »Vu les nouvelles mesures sanitaires restrictives face à la pandémie de la Covid-19 anno.
29 June, 2021
On June 25th 2021,  the Executive Director of MEDREC, along with the project management members of REFAT and ICAPT projects, and the Energy Manag.
28 June, 2021
During a seminar (info event and workshop) organized by Co-Evolve4BG project on the 25th and 26th June 2021, the Mediterranean Renewable Energy Centre.
18 June, 2021
On Thursday, June 17th, the Agency for the Promotion of Agricultural Investments (APIA) and the Mediterranean Renewable Energy Center (MEDREC) signed.
16 June, 2021
The National Institute for Marine Science and Technology (INSTM) organized on the 16th and 17th of June the final conference for the PEER Project.
9 June, 2021
En partenariat avec le Ministère de l’Agriculture, de la Pêche et des Ressources Hydrauliques, le Centre Méditerranéen des Énergies Renouvelables (MED.